Positive Drill Campaign Results at the BAM Gold Project
London, United Kingdom - 18June 2025 - Landore Resources Limited (AIM: LND) ("Landore Resources" or the
"Company"), is pleased to announce the assay results in respect of its Spring 2025 resource drilling programme, which
confirm additional mineralisation to the east and west of the existing mineral resource, as well as consistency of grade, at its
flagship BAM Gold Project ("BAM" or the "Project") at the Junior Lake property in Ontario, Canada. These drilling results
will form the basis of an updated Mineral Resource Estimate ("MRE") expected to be received in Q3 2025.
Highlights:
· 14 holes were drilled for a total of3,549 metres using HQ diamond core drilling across BAM East and West including
1,000 metres of infill drilling.
· Results have confirmed down dip mineralisation in the eastern zone with drill hole 0425-856 reporting an interval of
1.03 metres at 10.60 grammes/tonne ("g/t") gold.
· Drilling has successfully infilled prospective drill lines at BAM East seeking to extend BAM's Indicated resources a
further 150 metres to the east.
·
Drilling results from BAM West have further confirmed the significant mineralisation potential in the deposit's
gabbroic rocks, with drill hole 0425-860 reporting an interval of 1.00 metre at 9.97g/t gold.
·
Campaign has increased confidence in the orebody at BAM and identified significant mineralisationand targets,
warranting further follow-up work.
· Results from this latest drill campaign will be utilised to update the existing BAM MRE, expected to be received in Q3
2025.
Landore Resources' CEO, Alexander Shaw, commented:
"These results from our latest drilling at BAM are extremely encouraging and demonstrate that our existing resource has the
potential to be expanded, as well as a proportion of the inferred ounces element converted into additional indicated gold
ounces.
"We have successfully extended the mineralisation to the east, identified high-grade intercepts at depth in the eastern area and
revealed strong gold potential within the gabbroic units to the west - all of which serve to reinforce the growing geological
and economic significance of BAM.
"With gold prices currently at more than US$3,400 per ounce, we are seeking to develop a gold project in one of the bestknown gold mining jurisdictions globally at the right time of the cycle. We look forward to releasing an updated MRE in the
next quarter and updating the market on the next phase of our growth strategy.
"We also intend to host investor webinars in the coming weeks to explain in more detail the significance of these latest
results."
Alexander Shaw, CEO Landore Resources, discussed these results with Sarah Lowther, Total Market Solutions. To
watch this interview and for the chance to have your questions directly answered by the Landore management team,
please head to our interactive investor hub via:https://investors.landore.com/link/NPwaEe
BAM Resource Drilling Programme
The Spring 2025 resource drilling programme, which consisted of a total of 14 drill holes for 3,549 metres of HQ diamond
core drilling, commenced in mid-March 2025 and was designed to provide greater clarity on the structure of the orebody,
increase overall confidence in the grade, size and continuity of the resource, as well as testing the considerable down-dip
potential.The drill core was fully orientated, with detailed structural measurements taken to fine tune surface and vein
orientations.
Selected key assay results returned include:
Easting
Northing
Drill-hole
No.
3050E
170S
Au
g/t
From
Metres
Interval*
Metres
0425-849
68.59
7.01
0.98
including
68.59
1.01
2.40
including
73.60
2.00
1.61
3150E
112S
0425-850
15.28
1.06
1.26
3150E
162S
0425-851
15.42
3.68
1.35
including
18.15
0.95
4.31
And
86.12
0.92
3.37
3150E
212S
0425-852
139.30
0.98
2.21
2750E
124S
0425-853
96.86
1.00
2.20
And
119.28
15.96
1.56
including
122.24
1.00
3.66
including
127.24
1.00
3.18
0425-854
41.35
1.00
1.51
And
57.15
5.00
0.61
And
184.85
1.00
1.13
And
191.85
1.00
2.04
And
270.47
0.73
2.39
0425-855
176.07
7.67
0.72
And
191.90
8.00
1.86
including
197.90
1.00
7.87
And
203.90
6.00
1.19
And
226.95
1.00
1.28
0425-856
107.65
1.00
1.34
And
110.65
1.00
2.14
And
143.50
1.00
1.53
And
184.25
1.00
1.45
And
211.62
3.20
5.56
including
212.31
0.69
8.39
And
226.90
9.02
1.0
including
226.90
1.00
4.76
And
300.46
2.03
8.14
including
300.46
1.03
10.60
0425-857
257.36
1.23
4.63
including
257.98
0.61
6.54
And
263.39
0.97
2.01
And
334.38
8.98
2.65
including
338.32
1.00
9.92
including
341.31
2.05
4.70
2700E
2550E
2500E
2300E
170S
110S
230N
40S
750E
700E
450N
360N
0425-859
153.75
0.92
2.16
And
159.26
1.00
7.37
0425-860
50.24
0.63
1.01
And
99.42
1.00
9.97
And
269.94
3.19
1.33
including
272.28
0.85
2.46
And
279.60
1.76
1.92
Note:
*- The holes were drilled north at 45-60 degrees into a lithological package dipping approximately 85-75 degrees to the south.The actual true thickness of
mineralisation is estimated to represent between 60-80% of the intervals shown in this table.
Figure 1: Map of Completed Drillholes
The Spring resource drilling programme was focussed on four areas of the BAM deposit, namely: the eastern extent of the
existing Indicated resource; the eastern and western zones; and the western extent of the existing Indicated resource. Drilling
has successfully identified significant mineralisation warranting further follow-up work.
Resource infill drilling - East:1,098 metres were completed through six drill holes (0425-847 to 0425-852) on cut grid lines
3050E and 3150E, establishing the required drill hole density to potentially extend BAM's existing Indicated resources a
further 150 metres to the east. All holes intersected typical BAM lithology, with assay results showing widths and grades
reflective of the "pinch-and-swell" mineralisation style observed elsewhere in the deposit. Drilling also reaffirmed the shallow
mineralisation potential of the area, with drill hole 0425-849 on line 3050E reporting 7.01 metres at 0.98g/t gold at 68.59
metres depth. Additionally, on line 3150E near-surface mineralisation was revealed in drill hole 0425-851 with 3.68 metres at
1.35g/t gold at 15.42 metres down hole.
Resource drilling - Eastern Area:1,605 metres were completed through five drill holes (0425-853 to 0425-857) located
beneath the east defined zone, from cut lines 2300E to 2750E testing depth extension potential below the eastern area. All
holes intersected typical BAM lithology and mineralisation. Results revealed excellent depth potential in the vicinity of line
2500 with drill hole 0425-856 reporting 2.03 metres at 8.14g/t gold including 1.03 metres at 10.60g/t gold in a fractured
contact zone between greywacke metasedimentary rock and tonalite at 300.46 metres down hole. Additional down dip
potential was identified in drill hole 0425-857 on line 2300E, reporting 2.65g/t gold over 8.98 metres including 9.92g/t gold
over 1.0 metre in greywacke located 334.38 metres down hole. Wider, lower grade zones were also intercepted such as 15.96
metres at 1.56g/t gold in drill hole 0425-853 on line 2750E.
Figure 2: Section Line Showing Drill Hole 0425-853
Resource infill drilling - West:486 metres were completed through two drill holes (0425-859 and 0425-860) to infill lines
700E and 750E testing both shallow and deeper mineralisation potential. Both holes intersected typical BAM lithology with
results showing encouraging up dip mineralisation in drill hole 0425-859 on line 750E, reporting 1.0 metre at 7.37g/t gold in
greywacke metasedimentary rock. Drill hole 0425-860 on line 700E identified further potential in the gabbro lithological unit,
reporting 1.0 metre at 9.97g/t gold.
Resource drilling - Western Area:357 metres were completed through one drill hole (0425-858), not shown in the table
above, to test for depth extension below the western area on line 1250E. Drilling intersected complex lithology at depth
which requires further work to fully interpret the localised geological environment.
BAM Gold Deposit's Geology and Mineralisation
Interpretive work and conceptual modelling conducted by Landore Resource's geological team and independent consultants
has indicated that the gold mineralisation resides within a series of tabular shaped zones oriented in a roughly en-echelon
configuration, generally parallel to the overall strike of the host rock units (east-southeast direction).
Shoots (Mullions) of significant gold mineralisation within the BAM Gold Deposit's eastern and western zones are interpreted
to dip approximately 30 degrees to the west. Interpretation of the drilling results has indicated the potential for repeating
shoots of significant gold mineralisation along strike east and west of the currently defined BAM resource.
Detailed structural logging of the Spring drilling programme's fully orientated core, together with the recently completed
BAM structural assessment, has further informed BAM's mineralisation model and will be utilised in producing the
forthcoming MRE update.
Regional Potential
Results from the Company's soil-till sampling programmes conducted east along strike for approximately 3 kilometres and
west for approximately 12 kilometres from the BAM Gold Deposit further support the potential for significant gold
mineralisation in these areas. Soil-till sampling has established the presence of widespread anomalous gold and multiple gold
trends, confirming the potential of this area to contain extensions of the BAM Gold Deposit.
BAM Resource
BAM is located approximately mid-way alonga highly prospective Archean greenstone belt, which traverses the Junior Lake
Property from east to west for over 45 kilometres. Thefavourablegreenstone belt ranges from 0.5 to 1.5 kilometres wide and
hosts multiple known gold occurrences including the Lamaune Gold Prospect.
The pre-existing MRE for BAM, announced by the Company on 8 February 2022, reported 49,231,000 tonnes (t) at 1.0 g/t for
1,496,000 ounces of gold including 30,965,000t at 1.0g/t for 1,029,000 ounces gold in the Indicated Category.
Junior Lake Property
The Junior Lake Property, 100% owned by Landore Resources, together with the contiguous Lamaune Iron property (90.2%
owned) and BAM Extensions claims (together, the "Junior Lake Property"), consisting of 32,768 hectares, is located in the
province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay and is host to: the BAM Gold
Deposit; the B4-7 Nickel-Copper-Cobalt-Platinum-Palladium Deposit; the VW Nickel-Copper-Cobalt Deposit; the Lamaune
Gold Prospect and numerous other precious and strategic metal occurrences.
Michele Tuomi (P.Geo., BSc.Geology), Director/CEO of Landore Resources Canada Inc. and a Qualified Person as
defined in the Canadian National Instrument 43-101 and with respect to the AIM Rules for Companies, has reviewed
and verified all scientific and technical mining disclosures contained in this announcement.
- ENDS Engage with us by asking questions, watching video summaries and seeing what other shareholders have to say on our
Interactive Investor hub at:
Landore Resources Investor Hub
For further information, please contact:
Landore Resources Limited
Alexander Shaw (CEO)
contact@landore.com
https://investors.landore.com/s/051b30
or engage with the Company directly:
Strand Hanson Limited
(Nominated Adviser and Joint Broker)
James Dance/Matthew Chandler/Robert Collins
Tel: 020 7409 3494
Hannam & Partners (Joint Broker)
Andrew Chubb/Matt Hasson
Tel: 020 7907 8500
Burson Buchanan (Financial PR)
landore@buchanancomms.co.uk
Bobby Morse/Oonagh Reidy
Tel: 020 7466 5000
Subscribe to our news alert service:https://investors.landore.com/auth/signup
About Landore Resources
Landore Resources (AIM: LND) is the 100% owner of the highly prospective BAM Gold Project, Northwestern Ontario,
Canada, which has an NI 43-101 compliant resource estimate of 1.5m oz Au (Indicated: 1.03m oz from 30.96Mt @ 1.0g/t;
Inferred: 467,000oz from 18.3M/t @ 0.8g/t). Ontario is Canada's largest gold producing province, and produced 3.9m oz,
accounting for 41% of Canada's total gold production in 2023. Landore Resource's strategic objective is to crystallise value
from BAM, as well as generating additional value from its non-core portfolio of precious and battery metals projects in
eastern Canada and the USA.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority
to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information
may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For
further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
DRLGPURWQUPAGBM
Share your feedback
Discover